Company statement

Empowering management by putting quality data at their fingertips !

If you want total control of every aspect of your company.
Have we got a product for you !
Showing posts with label Tasks. Show all posts
Showing posts with label Tasks. Show all posts

Thursday, March 1, 2012

Adding new task types just became a much easier

No more difficult searching in a grid !

Now you can edit the existing task type in a window with clear and easy display


Now you can add the new task type in a window with clear and easy display

We saved the best for last

Now you can duplicate the existing task type to new types with no effort at all
While duplicating the original type you can manipulate the new task type to better suit your needs.
Don't forget to insert a new name it is the only mandatory field !

Please note! 
Task type names are not case sensitive and the system will not allow two tasks with the same name (Example "QC","qc","Qc" are regarded as the same)

Wednesday, February 15, 2012

New ! Non flexible date indicator has arrived !

The new indicator is available in 4 different places throughout the system.
  • Series
  • Template
  • Order
  • Task

Series

The series Date not flexible check-box was added to the Series information page.
The new indicator enables the manager to determine that all new orders created for the series will have order level non flexible dates meaning all of its tasks will have non flexible dates!

Template

The template Date not flexible check-box was added to the Template tasks page.
The new indicator enables the manager to determine that all new orders created for the series will have specific task level non flexible dates meaning only tasks based on the marked template task will have a non flexible date!

Order

The order button/indicator was added to the the following pages:
  • Orders
  • Tabular orders update

The new button/indicator enables the manager to determine that All order tasks will have non flexible dates!

All task dates are non flexible at order level.
No order level flexibility set. (does not indicate task level flexibility!)

Task

The task button/indicator was added to the the following pages:
  • My tasks
  • Tasks
  • Employee allocation to task
  • Order task - info
  • Schedule - in the task grid
  • Rapid task allocation to employee
  • Quick employee tasks assigning
  • Employee set task priority

The new button/indicator enables the manager to determine that a specific task will have non flexible dates!

Task date is non flexible. This can be from order level or from task level.
Task level flexibility not set. (this will appear only in button mode for managers)

Please note !
Order level flexibility cannot be changed at task level and vice versa!

Wednesday, February 8, 2012

Task date binding just got better !

Rebind a task back to it's bonded dates :

Adjacent to the "Internal delivery date" we added new button.



Date is bound Pressing the button will result in a message.
Date is not bound Pressing the button rebind the date to the original date.

reconnect button added in the following pages :

Page

  

Location

Schedule tasks    In the task grid
Rapid task allocation to employee    In Tasks grid
Quick employee tasks assigning    In the Grid view
Employee set task priority    In the task grid
Employee allocation to task    In the grid
Order task info    In the grid

Order level rebind button

Consolidated order date update    In a new column called Rebind dates
Orders    After the order number
Tabular orders update    After the order number

Please note !
Order level bind button has different button behavior.

Pressing the button will result in a message.
Pressing the button open Order task info enabling the user to change the date binding.

Rebind all the tasks dates at once !


In the Order task info page the user can rebind all the tasks dates at once
By pressing the Rebind all dates button located at the bottom of the task grid.


The system does not check or change completed tasks !

Sunday, December 11, 2011

New Task date binding

Now you can bind the task to 3 optional dates :

  1. Select Task required date to set each task date separately.
  2. Select Step delivery date to bind the task to the step date.
  3. Select Order internal supply to bind the task to the order internal date.

Any change to the date the task is bound to will is reflected in the task.
If the task date is manually changed and doesn't match the original date the the binding is revoked.


Default task type date binding



Use the task type date binding to set general default binding for templates and new tasks.
This binding can be changed in every template and order separately to override the default.

Default template task date binding


Use the template date binding to set order default binding for new orders.
This binding can be changed in every order separately to override the default.

Task date binding



Use the task date binding to set the specific task binding to an order date.

Please note,
A task canot be Assign NOT required and Set date by as Task required date at the same time ! The value will be set by the system to Step delivery date by default with the following message!

Saturday, December 3, 2011

New Rapid task allocation to employee


Set task date in 3 ways :

  1. Set Task date and select the Task required date in the Set date by combo-box.
  2. Select Step delivery date in the Set date by combo-box to set the target language date to the task.
  3. Select Order internal supply date in the Set date by combo-box to set the internal order date to the task.

Quick filtering of both Employee and Tasks in one go :



Languages and Task combo-boxes filter both grids, removing unqualified employees from the Employee grid list while filtering the Tasks grid at the same time.

Easy Drag & Drop task allocation to employee :


Fast navigation options to expand both panels :