Company statement

Empowering management by putting quality data at their fingertips !

If you want total control of every aspect of your company.
Have we got a product for you !

Wednesday, December 21, 2011

Consolidated order date update
Just became more flexible

Consolidated order date update is now more customizable



The user can now set up the way dates are copied between step dates by checking the.


The check box changes the way the system updates the dates of the steps in the order:

  1. If checked each date can now be changed manually without effecting the next.  This is intended for the use of companies that translate to a single language and the following languages have specific dates.
  2. If left unchecked the second step (that is a language) copies its date to the rest of the following steps. This is intended for the use of companies that translate to a single language and the from that language translate to all additional languages. 
Please note ! 
This setting is global and effects all users using this page. 

Employee availability is here

Employee availability has arrived



Employees can now report there availability to perform tasks.



Manager assigning an employee can now see the availability of the employee in the date selector enabling the manager to take into consideration the employees requests.

Monday, December 19, 2011

Telerik Case Study on Translation Manager



Translation Manager has been chosen by Telerik for case study publication.
The case study demonstrates a very successful integration of Telerik Rad controls toolkit within Translation Manager.
Translation Manager incorporates a large number of Telerik ajax controls to bring a complete and fluent customer experiences.

For more information here...

Sunday, December 11, 2011

New Task date binding

Now you can bind the task to 3 optional dates :

  1. Select Task required date to set each task date separately.
  2. Select Step delivery date to bind the task to the step date.
  3. Select Order internal supply to bind the task to the order internal date.

Any change to the date the task is bound to will is reflected in the task.
If the task date is manually changed and doesn't match the original date the the binding is revoked.


Default task type date binding



Use the task type date binding to set general default binding for templates and new tasks.
This binding can be changed in every template and order separately to override the default.

Default template task date binding


Use the template date binding to set order default binding for new orders.
This binding can be changed in every order separately to override the default.

Task date binding



Use the task date binding to set the specific task binding to an order date.

Please note,
A task canot be Assign NOT required and Set date by as Task required date at the same time ! The value will be set by the system to Step delivery date by default with the following message!

Saturday, December 3, 2011

New Rapid task allocation to employee


Set task date in 3 ways :

  1. Set Task date and select the Task required date in the Set date by combo-box.
  2. Select Step delivery date in the Set date by combo-box to set the target language date to the task.
  3. Select Order internal supply date in the Set date by combo-box to set the internal order date to the task.

Quick filtering of both Employee and Tasks in one go :



Languages and Task combo-boxes filter both grids, removing unqualified employees from the Employee grid list while filtering the Tasks grid at the same time.

Easy Drag & Drop task allocation to employee :


Fast navigation options to expand both panels :


Friday, December 2, 2011

New header context menu !

New header context menu added to grids throughout Translation Manager

Context menu features :

  1. Dynamic display and hiding of columns (a column picker), 
  2. Complex filtering 
  3. Sorting and clearing of sorting.
  4. Auto-size of column to it's content. 

Complex filtering

Column picker